Modernization of electrical installation for automation
Modernisation of the electrical installation for the automation of 24 hoists on the galvanising line.
The 24 old control cabinets were replaced with 4 new cabinets which are responsible for the correct operation of the 24 hoists.
A fibre optic connection was used between the cabinets and the switchgear.